BKRR 4116 has left 9 empties on the north side of the bridge (left in this scene) as it heads into the 3-track yard at Eagle Bridge (right in the scene) to make up their train (11 loads) for the northbound move. That will free up a track so that the empties can be brought down for Pan Am interchange. |
Date:
1/2/2019 |
Location:
Eagle Bridge, NY Map ![Show Eagle Bridge on a rail map](/images/map_us.gif) |
Views:
301 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Bob Krug |
Locomotives: |
Author: Bob Krug
|
![BKRR 4116 heads solo across the Hoosick River bridge](http://s3.amazonaws.com/rrpa_photos/130451/G&J%204116%20northbound%20Hoosick%20River%20Bridge.jpg) |
Picture Categories: Scenic,Bridge,Action |
This picture is part of album: Battenkill Railroad 2019 |