I was told the the 365 was needing to get her 92 day inspection done. I imagine that's the reason why it wasn't;t put in the lead for the trip north. |
Date:
8/7/2023 |
Location:
Akron, OH Map  |
Views:
82 |
Collection Of:

Fred Stuckmann |
Locomotives: |
Author: Fred Stuckmann
|
 |
Picture Categories: Passenger,Action |
This picture is part of album: ABC uses Wheeling power to deliver CVSR 365. |